Please use this identifier to cite or link to this item: http://studentrepo.iium.edu.my/handle/123456789/3364
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFatimah Az-Zahra binti Harisen_US
dc.date.accessioned2020-08-20T10:47:59Z-
dc.date.available2020-08-20T10:47:59Z-
dc.date.issued2013-
dc.identifier.urihttp://studentrepo.iium.edu.my/jspui/handle/123456789/3364-
dc.description.abstractPublic private partnership (PPP) has been continuously being a preferable procurement mode used by the Government. This present study is conducted to seek the perception of the main PPP contracting parties which are public sector and private sector on how they perceive the PPP implementation in Malaysia. In particular, the perception on the importance of PPP objectives, attractive factors, negative factors, driving forces and value for money (VFM) measures were sought from the respondents. Using a questionnaire survey, 180 completed responses were received representing 72% response rate. The results were then analysed using descriptive statistical tests which include mean and standard deviation. In addition, mean score ranking was also used to rank the factors according to the level of importance. The results show that the top three objectives are ‘to enhance private sector involvement in economic development’, ‘to improve efficiency of public services delivery’ and ‘to improve privatisation programme’. In relation to the attractive factors for PPP adoption, the top five attractive factors are ‘to facilitate innovative approaches’, ‘solve the problem of public sector budget restraint’, ‘provide an integrated solution for public infrastructure or services’, ‘save time in delivering the project’ and ‘benefit to the local economic development’. The top five negative factors that hinder the adoption of PPP are ‘lengthy delay in negotiation’, ‘lack of government guidelines and procedures on PPP’, ‘higher charge to direct users’, ‘lengthy delay because of political debate’ and ‘confusion over government objectives and evaluation criteria’. The key driving forces for PPP implementation in Malaysia as perceived by the respondents include 'economic development pressure of demanding more facilities‘, ‘high quality of service required’, ‘shortage of government funding’, ‘private incentives’ and ‘social pressure of poor public facilities’. Finally, the respondents perceived that ‘competitive tender’, ‘private sector technical innovation’, ‘optimal use of asset/facilities to the public sector‘, ‘efficiency in risk allocation’ and ‘performance based payment mechanism’ as the top five most important measures to enhance VFM achievement from PPP projects in Malaysia. The findings of the present study are of practical significance to policy makers and practitioners of PPP in Malaysia. The study also expects to add to the limited knowledge in this field as PPP implementation is continuously progressing in Malaysia.en_US
dc.language.isoenen_US
dc.publisherKuala Lumpur: International Islamic University Malaysia, 2013en_US
dc.rightsCopyright International Islamic University Malaysia
dc.subject.lcshPublic-private sector cooperation -- Malaysiaen_US
dc.titlePerception on the implementation of public private partnership (PPP) in Malaysiaen_US
dc.typeMaster Thesisen_US
dc.identifier.urlhttps://lib.iium.edu.my/mom/services/mom/document/getFile/sJemcylxMFOhzu3DPELRCeQy5MKKnBs420141127085521140-
dc.description.identityt00011301591FatimahAzZahraen_US
dc.description.identifierThesis : Perception on the implementation of public private partnership (PPP) in Malaysia /by Fatimah Az-Zahra binti Harisen_US
dc.description.kulliyahKulliyyah of Economics and Management Sciencesen_US
dc.description.programmeMaster of Science in Accountingen_US
dc.description.degreelevelMasteren_US
dc.description.callnumbert HD 3872 M4 F253P 2013en_US
dc.description.notesThesis (MSACC)--International Islamic University Malaysia, 2013en_US
dc.description.physicaldescriptionxii, 116 leaves : ill. ; 30cmen_US
item.openairetypeMaster Thesis-
item.grantfulltextopen-
item.fulltextWith Fulltext-
item.languageiso639-1en-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.cerifentitytypePublications-
Appears in Collections:KENMS Thesis
Files in This Item:
File Description SizeFormat 
t00011301591FatimahAzZahra_SEC_24.pdf24 pages file577.69 kBAdobe PDFView/Open
t00011301591FatimahAzZahra_SEC.pdf
  Restricted Access
Full text secured file1.33 MBAdobe PDFView/Open    Request a copy
Show simple item record

Page view(s)

20
checked on May 18, 2021

Download(s)

12
checked on May 18, 2021

Google ScholarTM

Check


Items in this repository are protected by copyright, with all rights reserved, unless otherwise indicated. Please give due acknowledgement and credits to the original authors and IIUM where applicable. No items shall be used for commercialization purposes except with written consent from the author.