Title: Industrialized building system : the government`s effort and contractors` response
Authors: Ahmad Firdaus bin Baharuddin
Subject: Industrialized building -- Malaysia
Construction projects -- Malaysia
Construction industry-- Malaysia
Year: 2015
Publisher: Kuala Lumpur : International Islamic University Malaysia, 2015
Abstract in English: The main problem for construction industry in Malaysia is the late delivery of projects. Due to late delivery of projects, the Government has introduced various strategies to ensure the delivery of projects right on time, as stipulated in the construction contracts. For projects worth more than RM10 millions, the Government has imposed the use of Industrialized Building System (IBS). Although, the Government has done a lot of promotions and efforts towards encouraging the use of IBS system, however, the contractors’ response towards it is vital to improve the future of our construction industry. This research is carried out by circulating sets of questionnaires to contractors who are registered with Construction Industry Development Board (CIDB). The focus is given to Grade G7 contractors because they are entitled to bid for work starting RM10 million and above. Secondary data is collected from IBS Centre and through some reading from industry publications such as ICU Weekly Performance Report, IBS Digest and others. Some of the data related to IBS system is collected through communications with industry experts and professionals. Most of the respondents are Bumiputra. They have undertaken three (3) or less IBS projects. Almost 90 percent of completed projects come from public sector development plans. From the survey, it is found that 71.3 percent preferred the use of pre-cast concrete system followed by pre-fabricated timber system with 13.9 percent. Only 47.8 percent of projects complied with the minimum requirement IBS score of 70 points and above. 65.2 percent of respondents did not know about Treasury Circular imposing the use of IBS system. 71.3 percent agreed that through their experience, the use of IBS system was moderate. However, most of the respondents agreed that IBS method will succeed in the future between the year 2016 to 2020.
Degree Level: Master
Call Number: t TH 1000 A2864I 2015
Kullliyah: Kulliyyah of Architecture and Environmental Design
Programme: Master of Business Administration (Construction Business)
URI: http://studentrepo.iium.edu.my/jspui/handle/123456789/2680
URL: https://lib.iium.edu.my/mom/services/mom/document/getFile/76sClJSmcQ6npnrrq4D3yUv3iADuffMz20160321160903093
Appears in Collections:KAED Thesis

Files in This Item:
File Description SizeFormat 
t11100341121AhmadFirdaus_SEC-24.pdf24 pages file446.7 kBAdobe PDFView/Open
t11100341121AhmadFirdaus_SEC.pdf
  Restricted Access
Full text secured file1.06 MBAdobe PDFView/Open    Request a copy
Show full item record

Page view(s)

22
checked on May 18, 2021

Download(s)

18
checked on May 18, 2021

Google ScholarTM

Check


Items in this repository are protected by copyright, with all rights reserved, unless otherwise indicated. Please give due acknowledgement and credits to the original authors and IIUM where applicable. No items shall be used for commercialization purposes except with written consent from the author.